Overview

Working closely with Asset Plus and Evonic, the London Borough of Hounslow (LBoH) targeted its portfolio of leisure centres with the aim of reducing its carbon footprint, energy consumption and operating costs.

LBoH were successful in obtaining grant funding via the Public Sector Decarbonisation Scheme (PSDS) for a number of suitable projects, including the Brentford Leisure Centre site.

Picture2@2x
Picture1@2x

Key Outcomes

64%

Carbon reduction

64% (7020 tonnes*)

55%

Energy saving

55% (37,260 MWh*)

26%

Financial saving

26% reduction in energy costs

*based upon 20 year economic life of the new plant

More info

The existing energy plant at the site was over 20 years old, inefficient and beyond its economic life. Our solution needed to provide improved resilience, be cheaper to run, use less energy and reduce the carbon footprint of the leisure centre. Any solution also needed to be fully compliant with the PSDS grant funding criteria. Keeping the leisure centre open to the public as much as practically possible was also a key requirement.

Several technical options were considered and modelled by Evonic. The chosen solution comprised 5 x Mitsubishi CAHV 500 air to water heat pumps providing a total thermal output of 225kW used to heat the pool and communal areas. A Mitsubishi QAHV 40 kW high temperature CO2 heat pump provides hot water for the changing room showers and other domestic hot water requirements. The existing gas fired boiler system was retained to provide residual top up heat in winter peak conditions, as well as back-up / resilience if required.

A new bespoke controls system ensures performance of the heat pumps is optimised according to heat demand and external temperatures. This system will also enable the assets to be operated commercially (i.e., linked to the price of electricity) to facilitate further cost reductions and efficiencies.

150 kWp roof mounted solar PV array provides renewable electricity. LED lighting compliments the energy efficiency measures applied to this project.

The works were carried out over a ten-week period, with the facility only being closed for three days during the final commissioning and changeover elements, minimising disruption to the leisure centre and the public.

Evonic’s ability to evaluate multiple design options, quickly establish the best solution, and translate all that into a business case to support the grant funding process was vital to the success of our projects. Luke and Stephen are both easy to work with, and are focussed always upon the success of the team.

Paul Burnett

Managing Director, Asset Plus Energy Performance Ltd

Technologies

Evonic are technology agnostic, and select the most appropriate solution to all our projects.

Heat Pumps
01

Heat Pumps

Solar
02

Solar

Gas Engines
03

Gas Engines

Asset Controls
04

Asset Controls

Energy Storage
05

Energy Storage

Hydrogen
06

Hydrogen