Public Sector Decarbonisation Projects

Public Sector Decarbonisation Projects

Overview

The government has set a target of reducing greenhouse gas emissions from public buildings by 75% by 2037 as part of its net zero strategy. Under the Public Sector Decarbonisation Scheme (PSDS), 19,900 projects have received £1.1 billion in grant funding to save over 900,000 tonnes of carbon per annum1.

Working closely with Asset Plus and a number of local authority’s, Evonic have contributed to the decarbonisation of 84 buildings including schools, leisure centres, libraries, and other public estate premises.

Key Outcomes

5.98 MW

5.98 MW

Installed capacity

5.98 MW Heat pump installed capacity

63,460 t

63,460 t

Carbon saved

63,460 tonnes*

1.7 MWh

1.7 MWh

Gas saved

1.7 MWh saved per annum

*based upon 20 year economic life of the new plant

More info

The objectives varied across the estate depending upon the project specific needs, but a number of core requirements for each solution were;

  1. Ensure future resilience of the energy plant for each site. Replacement of time expired gas boiler plant was a key criteria when selecting suitable buildings.
  2. Reduce greenhouse gas emissions to ensure compliance with PSDS funding criteria.
  3. Reduce the annual energy consumption for each building selected.

Our general design and delivery philosophy was to utilise multiple modular “off the shelf” heat pump units to replace the gas boilers with the new heat pumps being integrated simply into the existing primary heat infrastructure. This provides resilience (e.g. if one unit fails), and ensures the design and operation is straightforward for the end users. Roof mounted solar thermal was also utilised on many of the sites to complement the heat pump system.

A new bespoke controls system ensures performance of the system is optimised according to heat demand and external temperatures. These controls will also enable the assets to be operated commercially (i.e., linked to the price of electricity) to facilitate further cost reductions and efficiencies.

The initial due diligence and surveys carried out at the beginning of the process was critical to the success of all 84 sites. This ensured that any planning permission and acoustic considerations were addressed at the design stage, along with early identification of asbestos and any abatement required. Given the increase in electrical demand imposed by the new heat pumps, another vital element to ensure success involved liaising with the relevant District Network Operator (DNO) to understand the incoming electrical capacity of each site, any potential network upgrade requirements, associated costs and the timeline for proposed DNO works.

1: Source: Salix Finance published figures as of 31 March 2022.

Evonic’s ability to evaluate multiple design options, quickly establish the best solution, and translate all that into a business case to support the grant funding process was vital to the success of our projects. Luke and Stephen are both easy to work with, and are focussed always upon the success of the team.

Paul Burnett

Managing Director, Asset Plus Energy Performance Ltd

Technologies

Evonic are technology agnostic, and select the most appropriate solution to all our projects.

Heat Pumps
01

Heat Pumps

Solar
02

Solar

Gas Engines
03

Gas Engines

Asset Controls
04

Asset Controls

Energy Storage
05

Energy Storage

Hydrogen
06

Hydrogen